Addressing the Chiefs and people of the Anlo State at a grand durbar to mark the celebration of the 2023 edition of the historic Hogbetsotso Festival, on Saturday, 4th November 2023, at Anloga in the Volta region.
President Akufo-Addo visits the Volta region
President Akufo-Addo visits the Volta region
These road projects include the dualization of the 22km Ho main road, the 30km Have to Kpando road, the upgrading of the Golokwati -Wli road, resealing of the 15km Asikuma junction to Ho road, graveling of the 30km Frankadua to Adidome road, and the surfacing of the 17.8km Matse-Klave and Lume Atsiame-Avetokoe roads.
The President also mentioned that the Eastern Corridor Roads have seen significant improvements during his administration, as of the end of 2022, 366 kilometers, or 74% of the Eastern Corridor Roads, had been upgraded from a poor to a good state, benefiting the movement of goods and people along the corridor.
President Akufo-Addo visits the Volta region
President Akufo-Addo further revealed that the government had secured US$89 million in funding from the African Development Bank for the construction of the 29.35 km Asutsuare Junction – Volivo road, the 39.2 km Dufor Adidome- Asikuma Junction Road, the 23.9km Asutsuare Junction – Aveyime road, and two (2) Interchanges at Dufor Adidome and Asikuma Junction.
These infrastructure developments are part of the government's efforts to improve transportation and connectivity in the Volta Region.


&format=jpeg)
&format=jpeg)
&format=jpeg)