Advertisement
ECG incurred a loss of GH¢2.4 million during Akosombo dam spillage
Akosombo Dam is spilling water, Ghana
Due to severe floods in the Volta Region in October last year, the Electricity Company of Ghana (ECG) faced a GH¢2.4 million loss.
Advertisement
The floods impacted GRIDCo's distribution station in Sogakope, causing widespread power outages.
Advertisement
ECG swiftly implemented measures, rerouting power from alternative stations to minimize risks and property damage.
Christina Jatoe-Kaleo, the ECG regional manager, revealed the operational disruptions during a press briefing in Ho.
Power supply from Adidome to Keta was affected, prompting ECG to utilize its Aflao station for the affected areas.
She emphasized public cooperation in protecting infrastructure, particularly power poles, by preventing bushfires, especially during the dry season.
Advertisement
Subscribe
Sportal WhatsApp
Latest Videos
Advertisement
Videos
Advertisement
Advertisement
More from Pulse Ghana
Advertisement